Present this Saturday were Paul V., Ron, Cully, Alden and Leverett.
The swing hangars, spring plank, were applied during the week.
Saturday, the new leaf springs were applied along with the pedestal binders.
I added 2 new quick disconnects to the shop air line to allow the 1/4 inch air lines to be directly connected.
Paul cleaned up the rust on the frame bolster in preparation of fitting a new center bowl liner and fitted the new bolster shims.