11/6/2021 Work Sesssion

It was a frosty start to the morning. Leverett, Bob, and Paul were at the shop. Click the photos below to read captions!

This upper remaining portion of the cab wall is one piece riveted to the first T iron roof rib. There are nearly as many rivets in the patch as there are holding the entire thing to the rib. It makes sense to replace the entire panel. We will have an complete reconstruction of the front cab wall. There is also heavy corrosion at the top seam that can be addressed with panel removed.