9/12/2020 Work Session

Jim Armstrong and Dick removed more material from the firebox.  Next looking at the top of the firebox wrapper for removal of stanchions, clamps, nuts and studs. 

Alex and Roger needle scaled the ladder from inside the original tender tank.  Once it was clean of corrosion, Alex gave it a coat of primer.  It'll get a second coat next weekend.  Bob and Paul VS located rivet holes in the new steel fireman's side of the cab.  Bob, Dick, Jim, and Paul then hot riveted in the new cross brace.   

It's beginning to look like a cab is taking shape!  Next riveting session will require about six people to hang this under the original cab roof.